In this 2011 project, fish passage improvements were applied at each end of the concrete flood control channel.
Plans – Upper Transition (Roosevelt St)
Plans – Lower Transition (9th Avenue)
In this 2011 project, fish passage improvements were applied at each end of the concrete flood control channel.
Plans – Upper Transition (Roosevelt St)
Plans – Lower Transition (9th Avenue)